Projects, Construction & Infrastructure

Contract control during delivery: notices, variations, delay, payment, taking-over and claims.

Product: Project Legal Protection

Article 01

The problem you face

Rights in a project are usually lost long before any dispute — in a missed notice, an undocumented instruction or a variation agreed by phone. Managing a contract during delivery is a different discipline from drafting it before signature.

  • Contractual notice periods that expire unnoticed
  • Instructions and variations without a paper trail
  • Delay and extension-of-time positions built too late
  • Evidence assembled after the fact

Who it is for: Developers, contractors, suppliers, operation and maintenance companies, and project owners.

Article 02

What we provide

  1. Contract review

    Construction, EPC, operation and maintenance, and supply contracts.

  2. Notices and contractual deadlines

    A deadline register and notice templates aligned to your contract.

  3. Variations, delay and extension of time

    Positions prepared as events happen.

  4. Payment, taking-over and guarantees

    Applications, certificates, retention and bonds.

  5. Claims

    Prepared with technical experts where delay, quantum or cost analysis is needed.

  6. Progressive evidence file

    Built through the project, ready if a dispute arises.

Article 03

Deliverables

Project Legal Protection

A scoped subscription with a periodic report on obligations, claims, deadlines and risk.

  • Obligations and deadlines register
  • Notice templates aligned to the contract
  • Periodic report on obligations, claims, deadlines and risks
  • Claim submissions with an evidence index
Article 04

Engagement stages

  1. 01Contract baseline

    What the contract requires, from whom, and when.

  2. 02Notice system

    Deadlines, templates and responsibilities in place.

  3. 03Periodic reporting

    Obligations, claims and risks reviewed on a fixed rhythm.

  4. 04Claims & settlement

    Positions advanced with the evidence already in hand.

Article 05

Frequently asked questions

Why involve counsel during delivery rather than at a dispute?

Because the outcome of most construction disputes is decided by what was notified, recorded and documented during the project.

Do you carry out delay or quantum analysis?

Delay, quantum and cost analysis need technical experts. We instruct and coordinate them and build their findings into the legal position.

Can the service start mid-project?

Yes. We begin with a contract baseline and a review of the current position, then put the notice system in place.